ANGOSTURAMINING GROUPLet’s talk ↗ES

MINE DEVELOPMENT · PROCESSING · TRADING

From mine
to gold doré.

Mine development, carbon-in-pulp (CIP) processing and gold doré trading.

Explore our business↗
CONCEPTUAL MINERAL COMPOSITION
MARKET REFERENCESDEMONSTRATION DATA
  • XAUGOLD
    2,500.00USD / oz t
    +0.45%
  • XAGSILVER
    30.00USD / oz t
    +0.28%
  • XPTPLATINUM
    950.00USD / oz t
    −0.16%
  • BRENTCRUDE OIL
    75.00USD / bbl
    +0.32%
  • DXYDOLLAR INDEX
    100.00points
    −0.12%
  • BTCBITCOIN
    60,000.00USD
    +1.20%

Fictional values for design preview · No market connection · The gold reference does not represent the doré sale price.

FEATURED PROJECTAngostura III
LOCATIONTumeremo, Sifontes, Venezuela
PUBLISHED STATUS In development
Explore the project ↗

ANGOSTURA’S BUSINESS

THREE INTEGRATED CAPABILITIES

Three activities.
One value chain.

Our business spans mine development, mineral processing and trading the resulting product.

01 / DEVELOPMENT

Mine development

We develop the mine at the origin of our gold business.

Meet the company ↗
02 / PROCESSING

CIP processing

We process ore through a circuit that includes adsorption onto activated carbon. CIP stands for carbon-in-pulp.

Explore the process ↗
03 / TRADING

Gold doré trading

Gold doré trading. Buyers and refineries can contact our team for commercial enquiries.

Commercial enquiry ↗

01 / THE PROJECT

IN DEVELOPMENT

Angostura III.
A phased development.

A gold processing project in development in Tumeremo, Sifontes, Venezuela. Plans include a phased processing plant and supporting infrastructure.

Angostura III

TUMEREMO, SIFONTES, VENEZUELA ↗
Conceptual general layout of Angostura III
GENERAL LAYOUT · REV. A · SPANISH ORIGINAL CONCEPTUAL · NOT FOR CONSTRUCTION

PLANNED PLANT AREAS

01

Ore receiving

Ore receiving, weighing and identification. The design includes stockpiling areas and segregated materials.

APPROXIMATE HIGHLIGHT · CONCEPTUAL DESIGN
DESIGN CAPACITY · PHASE 1250 t/d
EXPANSION · PHASE 2600 t/d
TARGET · PHASE 31,000 t/d
PHASED GROWTH

Design capacities published by the company, expressed in tonnes per day (t/d). These do not represent current production.

View the planned schedule +

PUBLISHED MILESTONES

December 2026 · Planned construction start

June 2027 · Planned operational start

2029 · Target expansion to 1,000 t/d

Schedule published on the source website, accessed on 21 September 2026. Subject to project development.
Conceptual representation of Campamento Angostura

Campamento Angostura · Tumeremo
Planned support base. Conceptual image from the current website.

SUPPORTING INFRASTRUCTURE / TUMEREMO

Campamento Angostura.
Operational support.

Campamento Angostura is planned as a support base: technical accommodation, administration, workshops and services for the Tumeremo operation.

5.0479 haPUBLISHED SITE AREA
104 / 168PLANNED BEDS · PHASES 1 / 2
Conceptual representation of Campamento Angostura in Tumeremo
CAMPAMENTO ANGOSTURAPRELIMINARY DESIGN · SUBJECT TO DETAILED ENGINEERING

02 / PROCESSING

FROM ORE TO DORÉ

From ore to doré.
Step by step.

The planned Angostura III processing sequence has eight stages. Select a stage to explore its purpose and control point.

STAGE 01 / 08

Receiving and sampling

Weighing, lot identification and representative sampling.

CONTROL POINTIdentification of incoming material
Contact the technical team ↗

03 / RESPONSIBILITY AND TRACEABILITY

CLARITY AT EVERY STEP

Traceability and
project commitments.

Explore the lot identification model and environmental and social roadmap. The statuses shown are those declared by the company.

↗

Identification and documentation

Lot identification, assay, weight and supporting documents: the elements of the traceability model described by the company.

◎

Environmental and social roadmap

The company publishes an environmental and social roadmap. It currently states that it has not obtained the certifications described.

View published statuses +
  • ISO 14001 / ISO 45001 In progress
  • OECD due diligence In progress
  • Cyanide Code In preparation
  • IRMA Planned
Statuses declared by the company; not independently verified.

04 / SOCIAL RESPONSIBILITY

TUMEREMO · SIFONTES · VENEZUELA

05 / THE COMPANY

The company.
Origins and presence.

Angostura presents a group track record dating to 2003, with projects and equity interests across Latin America and the Caribbean.

Ask about the company ↗
01 / ORIGIN AND MANAGEMENT

Buenos Aires

Argentina

02 / ANGOSTURA III PROJECT

Tumeremo

Sifontes, Venezuela

03 / CORPORATE SEAT

Wyoming

United States

THE NEXT STEP

Talk to
our team.

Contact Angostura for commercial enquiries, collaboration proposals or technical information.

Email the team ↗

YOUR EMAIL APPLICATION WILL OPEN.

Project information is based on company publications as of 21 September 2026 and updates supplied for this website. Capacities and dates are planned; drawings are conceptual.
↑